Enter your keyword

Course

CCNP Training

CCNP TRAINING TIMETABLE (DURATION-2 WEEKS)

START (MM/DD/YY)ENDDAYSTIMELOCATION
APRIL 2020
04/03/20
04/14/20 M,T,W,T,F 10:00 - 16:00London
04/20/20
04/28/20 M,T,W,T,F 10:00 - 16:00London
04/08/20
05/13/20Saturday 13:00 - 19:00London
MAY 2020
05/01/20
05/12/20
M,T,W,T,F 10:00 - 16:00London
05/15/20
05/26/20
M,T,W,T,F 10:00 - 16:00London
05/20/20
05/24/20
Saturday 13:00 - 19:00London
JUNE 2020
06/05/20
06/16/20
M,T,W,T,F 10:00 - 16:00London
06/19/20
06/30/20
M,T,W,T,F 10:00 - 16:00London
JULY 2020
07/03/20
07/14/20
M,T,W,T,F 10:00 - 16:00London
07/20/20
07/28/20
M,T,W,T,F 10:00 - 16:00London
07/01/20
07/08/20
Saturday 13:00 - 19:00London
AUGUST 2020
08/07/20
08/18/20
M,T,W,T,F 10:00 - 16:00London
08/12/20
08/09/20
M,T,W,T,F 10:00 - 16:00London
08/21/20
08/16/20
Saturday 13:00 - 19:00London
SEPTEMBER 2020
08/21/20
09/01/20
M,T,W,T,F 10:00 - 16:00London
09/04/20
09/15/20
M,T,W,T,F 10:00 - 16:00London
09/18/20
09/29/20
M,T,W,T,F 10:00 - 16:00London
09/23/2017
10/28/2017
Saturday 13:00 - 19:00London
OCTOBER 2020
10/02/20
10/13/20
M,T,W,T,F 10:00 - 16:00London
10/16/20
10/27/20
M,T,W,T,F 10:00 - 16:00London
NOVEMBER 2020
11/06/20
11/20/20
M,T,W,T,F 10:00 - 16:00London
11/20/20
12/01/20
M,T,W,T,F 10:00 - 16:00London
11/04/20
12/09/20
Saturday 13:00 - 19:00London
DECEMBER 2020
12/04/20
12/15/20
M,T,W,T,F 10:00 - 16:00London
12/18/20
12/29/20
M,T,W,T,F 10:00 - 16:00London

Course Description

CCNP Exam 300-101: CISCO ROUTE
– Network resources needed for implementing EIGRP on a network
– Create an EIGRP implementation plan, EIGRP verification plan
– Configure EIGRP routing
– Verify EIGRP solution was implemented, Use show and debug commands
– Document results of EIGRP implementation and verification
– Determine network resources needed for implementing OSPF on a network
– Create an OSPF implementation plan, OSPF verification plan
– Configure OSPF routing
– Verify OSPF solution was implemented properly using show and debug commands
– Document results of OSPF implementation and verification plan
– Determine network resources needed for implementing eBGP on a network
– Create an eBGP implementation plan
– Create an eBGP verification plan
– Configure eBGP routing
– Verify eBGP solution was implemented properly using show and debug commands
– Document results of eBGP implementation and verification plan
– Determine network resources needed for implementing IPv6 on a network
– Create an IPv6 implementation plan, IPv6 verification plan
– Configure IPv6 routing
– Configure IPv6 interoperation with IPv4
– Verify IPv6 solution was implemented properly using show and debug commands
– Document results of IPv6 implementation and verification plan
– Create a redistribution implementation plan based upon the results of the redistribution analysis
– Create a redistribution verification plan
– Configure a redistribution solution
– Verify that redistribution was implemented
– Document results of a redistribution implementation and verification plan
– Identify the differences between implementing an IPv4 and IPv6 redistribution solution
– Create a Layer 3 path control implementation plan based upon the results of the redistribution analysis
– Create a Layer 3 path control verification plan
– Configure Layer 3 path control
– Verify that a Layer 3 path control was implemented
– Document results of a Layer 3 path control implementation and verification plan
– Implement basic teleworker and branch services
– Describe broadband technologies
– Configure basic broadband connections
– Describe basic VPN technologies
– Configure GRE
– Describe branch access technologies
CCNP Exam 300-101: CISCO ROUTE
– Determine network resources needed for implementing a VLAN based solution on a network
– Create a VLAN based implementation plan
– Create a VLAN based verification plan
– Configure switch-to-switch connectivity for the VLAN based solution
– Configure loop prevention for the VLAN based solution
– Configure Access Ports for the VLAN based solution
– verify the VLAN based solution was implemented properly using show and debug commands
– Document results of VLAN implementation and verification
– Determine network resources needed for implementing a Security solution
– Create a implementation plan for the Security solution
– Create a verification plan for the Security solution
– Configure port security features
– Configure general switch security features
– Configure private VLANs Configure VACL and PACL
– Verify the Security based solution was implemented properly using show and debug commands
– Document results of Security implementation and verification
– Determine network resources needed for implementing eBGP on a network
– Create an eBGP implementation plan
– Create an eBGP verification plan
– Configure eBGP routing
– Verify eBGP solution was implemented properly using show and debug commands
– Document results of eBGP implementation and verification plan
– Determine network resources needed for implementing a Switch based Layer 3 solution
– Create an implementation plan for the Switch based Layer 3 solution
– Create a verification plan for the Switch based Layer 3 solution
– Configure routing interfaces Configure Layer 3 Security
– Verify the Switch based Layer 3 solution was implemented properly using show and debug commands
– Document results of Switch based Layer 3 implementation and verification
– Implement a Wireless Extension of a Layer 2 solution
– Implement a VoIP support solution
– Implement video support solution
– Determine network resources needed for implementing High Availability on a network
– Create a High Availability implementation plan
– Create a High Availability verification plan
– Implement first hop redundancy protocols
– Implement switch supervisor redundancy
– Verify High Availability solution was implemented properly using show and debug commands
– Document results of High Availability implementation and verification
CCNP Exam 300-135: CISCO TSHOOT
– Develop a plan to monitor and manage a network
– Perform network monitoring using IOS tools
– Perform routine IOS device maintenance
– Isolate sub-optimal internetwork operation at the correctly defined OSI Model layer
– Multi Protocol system networks
– EIGRP
– OSPF
– eBGP
– routing redistribution solution
– a DHCP client and server solution
– NAT
– first hop redundancy protocols
– IPv6 routing
– IPv6 and IPv4 interoperability
– switch-to-switch connectivity for the VLAN based solution
– loop prevention for the VLAN based solution
– Access Ports for the VLAN based solution
– private VLANS
– port security
– general switch security
– VACL and PACL
– switch virtual interfaces (SVIs)
– switch supervisor redundancy
– switch support of advanced services (i.e., Wireless, VOIP and Video)
– a VoIP support solution
– a video support solution
– Layer 3 Security
– issues related to ACLs used to secure access to Cisco routers
– configuration issues related to accessing the AAA server for authentication purposes
– security issues related to IOS services (i.e.,finger, NTP, HTTP, FTP, RCP etc.)
– Determine network resources needed for implementing eBGP on a network
– Create an eBGP implementation plan
– Create an eBGP verification plan
– Configure eBGP routing
– Verify eBGP solution was implemented properly using show and debug commands
– Document results of eBGP implementation and verification plan
Start On 2017-03-02
Duration 2 WEEKS
Price £3,200.00

Share our course